• Five ways to maximize your fiber blowing distance

    Have you ever experienced being unable to reach the planned distance in your fiber blowing jobs? In this article, we discuss five ways to maximize your fiber blowing distance.

  • The Fremco Y-block updated with an even better grip

    The Fremco Y-Block is the perfect tool for working with old existing ducts. It has been upgraded making it even easier to handle for the installation team.

  • Why should you clean the duct before installing the fiber?

    A clean duct is a must, if you wish to have the best conditions for your fiber blowing job. The preparation can save you time and money in the end, and it gives you a smoother fiber blowing installation.

  • New accessory. Let the mini drum rack improve your work environment

    Mini drum rack is the perfect accessory when blowing with small fiber dimensions

  • Fremco’s enhanced PowerFlow RAPID and MultiFlow RAPID

    Introducing the enhanced PowerFlow RAPID and MultiFlow RAPID

  • How to avoid spending time and money on digging up incorrectly installed ducting, extra establishment of manholes and delays?

    How to avoid spending time and money on digging up incorrectly installed ducting, extra establishment of manholes and delays? A case story

  • Optimizing duct diameter range with the use of the versatile Y-block

  • New Lubrication Pump Kit

    Lubrication pump kit for PowerFlow and MultiFlow

  • NanoFlow MAX: Larger cable diameter, more power, bigger opportunities

    NanoFlow MAX: Cable diameter increase of 50%